Pontlliw Primary School

Our representative Lee Jeffries met with Mrs Norman to discuss surfacing requirements for an outdoor space within the school.  Lee produced a quote with a plan showing the surfacing layout with two colours; the green ‘Island’ is surrounded by the blue ‘Sea’.  The existing area was a worn dirt with a layer of sunken rubber matting.  Some of the areas required the rubber matting to be removed prior to the surfacing going down along with some slabs. The area was marked out and confirmed with the school during the installation.

Plan 2

Before and After Photos of the Installation Areas:

pontlliw

Blue and Green (3)

‘‘The children are really pleased with the new play surface and have enjoyed using it this week. The men that completed the job were a credit to your company. Reliable, efficient and very competent at their jobs. Please pass on my comments to those involved. The new play surface has enabled the children to make the most of the outside area without getting covered in mud. Thank you for completing the job on time and so well.’’

Alison Norman

Head Teacher – Pontlliw Primary School