Chilton Primary School, Oxfordshire

Our representative Lee Jeffries met with Miss Reardon to discuss their requirements for an outdoor bicycle track.  Lee produced a quote with a plan showing how the track would look along with small parking bays for the bicycles and a pathway leading into the area.  The top layer of turf had to be removed from the area prior to the new surface being installed.  The area was marked out and confirmed with the school during the installation.

Chilton plan

Before and After Photos of the Installation Areas:

Chilton before 1 Chilton before 2 Chilton after

 The area now has an all-weather bicycle track to provide hours of fun and learning through play.

 ‘‘We have recently used Maxim Play for our new cycle track installation and would happily recommend them. The quote was competitively priced and provided in a timely manner, without too much pushy ‘sales talk’. It was good to have Lee helping with the installation, as well as the original quote, as he was aware of our requirements and meant that I had confidence in leaving the team to get on with their installation. The installers arrived on time, left the site clean and tidy and went above and beyond their brief by using some of the cut turf to help us create an additional tunnel feature”

Christine Reardon

Business Manager – Chilton Primary School